Duck Pond construction
Spencer Low, (left), Russ Gentry, (backhoe driver), and Dan Postak, Gentry Construction, dig a trench to install a drainage system near playground equipment at the Duck Pond Sept.13. The parking area will remain open through all phases of the project. (U.S. Air Force photo/Staff Sgt Matthew McGovern)